Parametry z BOI
PM10 (pył): 1.85 / Ozon: 2.45 / NO2: 3.15
News
The Norwegian premiere
2 march 2015
The Norwegian inauguration of the MONSUL project took place in Lillehammer on 24–28 February 2015.
A team of scientists from the Faculty of Process and Environmental Engineering of the Lodz University of Technology and the experts of the Norwegian Institute for Water Research of Oslo discussed the initial matters of objectives, tasks, research implementation and providing a monitoring system for the Sulejów Reservoir. The experiences, concepts and joint actions of partner institutions were discussed in the scope of planned effects. The tools used to implement the tasks and process collected data were also presented. The potential and possible application of the GEMSS software were discussed in great detail, followed by a training workshop for the software.
The detailed objectives and scope of the MONSUL Project are as follows:
- installation and commissioning of a measurement system for the assessment of reservoir water quality (floating on the surface of the reservoir and transmitting on-line data to a computer). The following parameters will be monitored: water temperature, pH, oxygen concentration, salination, chlorophyll concentration, Ntotal and Ptotal.
- development of a GIS database for the Sulejów Reservoir area,
- development of a 3D model of the Sulejów Reservoir. The model will enable calculations of temperature gradients, flow rates and pollution concentrations as well as the simulation of the ecological condition of the reservoir,
- publication of the results via the website, magazine articles as well as meetings and seminars.
Partners
Partners